Tori Gutierrez
????????
BCL Concrete Constructions is a concrete contractor that pours and repairs concrete for homeowners in Bossier City. Its crew digs out soft spots and compacts a gravel base before pouring.
Last Updated October 3, 2026.
Bossier City, LA, Shreveport, LA, Marshall, LA, Minden, LA, Haughton, LA, Mansfield, LA, Springhill, LA, Greenwood, LA, Benton, LA, Vivian, LA and Stonewall, LA.
BCL Concrete Constructions is one of 9 concrete & masonry contractors ProsGrade lists in Bossier City, Louisiana.
9 services listed, including Concrete driveways, Concrete patios and Stamped concrete. Open 7 days a week. Rated 4.7 from 17 reviews.
How BCL Concrete Constructions compares with the other 8 concrete & masonry contractors on ProsGrade in Bossier City, using public Google ratings and review counts.
Customers praise the work and speak positively about the crew. One detailed account describes a large driveway completed quickly, with attention to safety around children and courteous service from the estimate through cleanup.
????????
Wonderful group to work with... Contracting made simple when you got the right people doing the A1 job can't go wrong ????
Good people/good business done right/fair
Work looks great but what I appreciated was that the communication was easy and friendly. Thank you BCL
Share your experience with this business. Reviews are moderated before they appear publicly.
Forming and pouring a standard driveway usually takes one to two days, depending on size and site access. It needs about a week before vehicles drive on it.
Permit requirements depend on the city or parish and whether the work changes drainage or is near a property line. Most residential patios and driveway replacements in existing footprints do not need a permit.
The company says pour defects such as improper curing or early joint failure are typically covered for a period specified in the written quote. It says cracking from extreme ground movement or heavy equipment driven onto a slab before curing usually is not covered.
A pour is rescheduled if the forecast turns to rain, since concrete cannot be poured in active rain. Rain generally does not hurt the concrete after about 24 hours of curing.