How long until I can park on a new concrete driveway?Timelines vary with weather and mix, but many projects take about 7-14 days from prep through initial curing. Ask your contractor for their staging and when foot traffic and then vehicle traffic are allowed.
What most affects the price of a concrete driveway?Size and layout, site prep and demolition, thickness and reinforcement, concrete mix and finish, drainage work, and local labor and material rates. Typical projects can range widely based on these choices and conditions.