Electrical Panel Upgrade
Installed project
Typical national range$1,000 - $7,000
Spokane adjusted range$1,000 - $7,000
Common cost factors
- Amperage and panel type: Upgrading from 100A to 200A, main breaker vs. subpanel, brand/quality affect material and labor.
- Labor complexity: Service relocation, tight spaces, drywall work, conduit, and permit/inspection time increase hours.
- Code upgrades and repairs: Grounding/bonding, meter/main upgrades, AFCI/GFCI breakers, and bringing older homes to code add cost.
- Site conditions: Distance to service, line/mast upgrades, utility coordination, and weatherproofing for exterior panels.
Common price components
- Labor (licensed electrician + helper) - $1,200 - $3,500Panel swap, wiring terminations, labeling, service tie-in, testing, and inspections.
- Panel, breakers, materials - $600 - $1,800200A load center, main breaker, AFCI/GFCI/dual-function breakers as required, grounding/bonding, lugs.
- Permits and inspections - $100 - $600Local permit application and required inspections.
- Service/meter/mast and code upgrades - $300 - $1,500Utility coordination, meter base, service mast/conduit, grounding electrode upgrades as needed.
- Patching and incidental repairs - $100 - $600Drywall/access repairs or weatherproofing after installation.