West Coast Construction Pro
West Coast Construction Pro is a Roseville home builder focused on ADU construction. It was incorporated in 2008.
Business Highlights
- It is licensed and insured and holds CSLB License #1122012.
- ADU additions carry a one-year labor warranty and a 10-year structural warranty.
- Siding installations carry a 10-year warranty.
Service Area
Auburn, Davis, Elk Grove, Folsom, Loomis, Rocklin, Roseville and Sacramento; the Sacramento metro area and Bay Area.
Featured on ProsGrade. West Coast Construction Pro is one of 11 home builders ProsGrade lists in Roseville, California.
5 services listed, including ADU construction, ADU plans and engineering and Custom home design. Open Monday to Saturday. Rated 5.0 from 81 reviews.
- Verified listing details
- Service information
- Customer review signals
- Photo gallery
- Public contact information
- Published local profile
How This Business Compares
How West Coast Construction Pro compares with the other 10 home builders on ProsGrade in Roseville, using public Google ratings and review counts.
- Ranks in the top quarter of the 11 Roseville home builders on ProsGrade by Google rating and review volume.
- Rated 5.0 on Google, well above the 4.5 average of other Roseville home builders on ProsGrade.
- Has more Google reviews (81) than 8 of the 10 other Roseville home builders on ProsGrade.
- One of 4 Roseville home builders on ProsGrade rated 4.7 or higher from at least 10 reviews.
Services Covered
5 services- ADU constructionSite-built stick framing.
- ADU plans and engineeringLot-specific custom floorplans; architectural plans and engineering.
- Custom home design
- James Hardie siding installationFiber-cement siding.
- Window and door installationDuring siding installation.
Reviews
What customers say
Customers praise clear communication and transparent project costs. One prospective client says James walked them through the ADU process without pressure, though they ultimately chose not to proceed for their own cost and ROI reasons; another describes a two-bedroom, two-bath ADU with a laundry closet and full kitchen, and credits project manager John with step-by-step updates.
Customer Reviews
Trisa Knight
Brian Bollinger
Write a Review
Share your experience with this business. Reviews are moderated before they appear publicly.
Frequently Asked Questions
What do West Coast Construction Pro’s ADU estimates include?
The posted ADU construction estimate includes appliances, sewer, water and electrical utility connections. Permit fees, solar or panel upgrades when required, septic systems when required, and driveway repairs for sewer connections are generally excluded.
How long does an ADU build take?
ADU construction averages three months, with work generally starting within two to three weeks after permit issuance. Permitting can take 60 days in some jurisdictions and up to five or six months in others.
How does West Coast Construction Pro handle siding projects?
The outlined sequence is an in-person estimate, permitting and then installation.








